LINE

Text:AAAPrint
Society

Beijing's new airport roof capped

1
2017-01-24 15:29China.org.cn Editor: Li Yan ECNS App Download

The roof of the main terminal of Beijing's new airport was capped Jan. 19, 12 days ahead of schedule, with the next phase of construction to focus on steel work.

The planned project of highway construction around the airport is under construction. Meanwhile, the planning of the widely-anticipated airport economic zone, will be launched this year, according to Cui Zhicheng, head of Daxing District.

The core area of the airport covers about 170,000 square meters. The main terminal building, with an overall floorage of 600,000 square meters, has the cast-in-place with a reinforced concrete frame structure for the main body and a space truss system for the roof steel structure.

Located beneath the terminal building will be a huge rail transit station. Six rail lines, including high-speed rails, subways and intercity railways, will cross the second floor underground.

In addition, Beijing will cooperate with its neighboring Hebei Province to build a new airport economic zone, to promote an in-depth and integral development of the area and to stimulate regional economic growth.

More than 200 billion yuan (US$29.2 billion) will be invested in the airport economic zone focusing on the development of the airport industry and low-input, high-output industry.

  

Related news

MorePhoto

Most popular in 24h

MoreTop news

MoreVideo

News
Politics
Business
Society
Culture
Military
Sci-tech
Entertainment
Sports
Odd
Features
Biz
Economy
Travel
Travel News
Travel Types
Events
Food
Hotel
Bar & Club
Architecture
Gallery
Photo
CNS Photo
Video
Video
Learning Chinese
Learn About China
Social Chinese
Business Chinese
Buzz Words
Bilingual
Resources
ECNS Wire
Special Coverage
Infographics
Voices
LINE
Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
Copyright ©1999-2018 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.