LINE

Text:AAAPrint
Business

Long-distance power line from Xinjiang to east China under construction

1
2018-03-30 11:14:49Xinhua Gu Liping ECNS App Download

An ultra-high-voltage power line, which will transmit electricity from Xinjiang to the east of China, is under construction.

The 598-km-long Xinjiang section of the 1100 kv transmission line was completed on Thursday, said the Xinjiang branch of State Grid Corporation of China (SGCC).

The entire line will be about 3,324 kilometers long.

It will set a new record in terms of voltage level, transmission capacity and distance, the company said.

Total investment is 40 billion yuan (about 6.4 billion U.S. dollars). Construction started in January, 2016.

The line passes through Xinjiang, Gansu, Ningxia, Shaanxi, Henan and Anhui. The power project is expected to be operational by year end.

The line will provide enough power to light up four billion light bulbs at the same time, the company said. Annual power transmission will be 66 billion kilowatt hours, cutting 30 million tonnes of coal transport.

An 800 kv ultra-high voltage direct current transmission line between Xinjiang and central China's Henan Province went operational in 2014.

  

Related news

MorePhoto

Most popular in 24h

MoreTop news

MoreVideo

News
Politics
Business
Society
Culture
Military
Sci-tech
Entertainment
Sports
Odd
Features
Biz
Economy
Travel
Travel News
Travel Types
Events
Food
Hotel
Bar & Club
Architecture
Gallery
Photo
CNS Photo
Video
Video
Learning Chinese
Learn About China
Social Chinese
Business Chinese
Buzz Words
Bilingual
Resources
ECNS Wire
Special Coverage
Infographics
Voices
LINE
Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
Copyright ©1999-2018 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.