LINE

Text:AAAPrint
Photo

3,000-ton wind farm installation vessel launched in Jiangsu(1/4)

2022-05-26 15:51:47 Ecns.cn Editor :Li Yan

Wudongde, China’s first high-performance deep-sea vessel specifically designed for the transport and installation of wind farm infrastructure, enters water in Haimen, east China's Jiangsu Province, May 25, 2022. (Photo provided to China News Service)

Equipped with a full-rotation transforming crane a DP2 dynamic positioning system, The vessel has a fixed maximum lifting weight of 3,000 metric tons.

Wudongde, China’s first high-performance deep-sea vessel specifically designed for the transport and installation of wind farm infrastructure, enters water in Haimen, east China's Jiangsu Province, May 25, 2022. (Photo provided to China News Service)

Wudongde, China’s first high-performance deep-sea vessel specifically designed for the transport and installation of wind farm infrastructure, enters water in Haimen, east China's Jiangsu Province, May 25, 2022. (Photo provided to China News Service)

Wudongde, China’s first high-performance deep-sea vessel specifically designed for the transport and installation of wind farm infrastructure, enters water in Haimen, east China's Jiangsu Province, May 25, 2022. (Photo provided to China News Service)

LINE
    ${visuals_2}
    ${visuals_3}
    ${new_video_hd2}
    ${new_video_hd3}
LINE
Back to top About Us | Jobs | Contact Us | Privacy Policy
Copyright ©1999-2022 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.
[网上传播视听节目许可证(0106168)] [京ICP证040655号]
[京公网安备 11010202009201号] [京ICP备05004340号-1]