Water at the Baihetan Hydropower Station reaches the normal level of 825 meters for the first time on Monday, Oct. 24, 2022. (Photo provided to China News Service)
The station is located on the Jinsha River, the upper section of the Yangtze River in southwest China. The total storage capacity of Baihetan Reservoir is set for 20.627 billion cubic meters, which accounts for 91 percent of the Jinsha River Basin.
Water at the Baihetan Hydropower Station reaches the normal level of 825 meters for the first time on Monday, Oct. 24, 2022. (Photo provided to China News Service)
Water at the Baihetan Hydropower Station reaches the normal level of 825 meters for the first time on Monday, Oct. 24, 2022. (Photo provided to China News Service)