(ECNS) -- The Lushan Super Large Bridge, a swivel bridge on the Jiangxi section of the Anqing-Jiujiang High-speed Railway, has been successfully rotated into place.
The weight of a single T-shape of the swivel bridge is 5,000 to 6,000 tons.
The horizontal position error of the bridge is limited to 4 mm.
The completion of the bridge's swivel will lay a foundation for the subsequent construction of the ballastless track and the passage of the Anqing-Jiujiang High-speed Railway.
RIGHT BG