LINE

Text:AAAPrint
Video

Asia's first cylindrical FPSO facility finishes main construction

2023-12-08 16:50:10Ecns.cn Editor : Luo Pan ECNS App Download

The main construction of Haiyang Shiyou 122, Asia's first cylindrical floating production, storage and offloading facility, designed and built by China, was finished on Wednesday in Qingdao, Shandong province, said its operator China National Offshore Oil Corp.  

The FPSO facility has a maximum oil storage capacity of 60,000 metric tons and a designed durability of 30 years.  

With a diameter of about 90 meters and designed displacement of 100,000 tonnes, the facility is capable of operating for 15 years at sea without returning to the dry dock.  

MorePhoto

Most popular in 24h

MoreTop news

MoreVideo

LINE
Back to top About Us | Jobs | Contact Us | Privacy Policy
Copyright ©1999-2023 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.
[网上传播视听节目许可证(0106168)] [京ICP证040655号]
[京公网安备 11010202009201号] [京ICP备05004340号-1]