Friday May 25, 2018
PHOTO
Text: | Print | Share

Repair work underway for road collapse in N China (1/5)

2012-12-27 16:01    Xinhua     Web Editor:Su Jie
Workers repair the damaged pipelines at the collapsed section of the road intersection of Bingzhou North Road and Bingzhou East Street in Taiyuan, capital of north China's Shanxi Province, Dec. 27, 2012. The backfilling of the collapsed section has begun, and the damaged pipelines for water and gas supply has been repaired and resumed operation on Thursday, a day after the road cave-in happened. The cave-in left a pit measuring around 3 to 4 meters deep, 15 meters long and 5 meters wide, while damaging pipelines for water, gas and telecommunication. (Xinhua/Zhan Yan)
  • Yao Ming promotes Play Unified campaign in Shanghai

  • Speculation causes panic buying of salt

  • N China's ancient salt lake in rosy hue

  • Aviation graduates ready to fly high

  • Elephant helps answer the call of nature

  • Copyright ©1999-2011 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.