Friday May 25, 2018
Home > News > CNS wire
Text:| Print|

Train maker addresses speed boost worries  

哈大高铁提速在即 制造商详解安全密码

中国北车集团长客股份公司CRH380B型高寒动车组项目负责人朱彦2日接受中新社记者采访时称,哈大高铁提速在即,作为设备制造商,长客正配合铁路部门对列车进行全面检测,以保障300公里时速的运行安全。

2013-04-03 10:27 Ecns.cn     Web Editor: Mo Hong'e comment

Changchun (CNS) – The manufacturer of the CRH380B bullet trains on the Harbin-Dalian High-speed Railway has addressed safety concerns ahead of an increase in speed for the warmer months ahead.

Zhu Yan, project chief of the weather-proof trains built by the CNR Changchun Railway Vehicles Co, said they are coordinating with railway departments to conduct thorough examinations and ensure safety ahead of the speed boost.

"Our technicians are conducting depot examinations every day," Zhu said, adding that they will check the traction and braking systems of all CRH380Bs before April 21.

"We already had a 2-month trial run before operating on December 1 last year. It worked very well and all indexes were up to standards," he said.

The bullet trains have withstood cold winds and blizzards without major failures, accidents or large scale delays, and they will be able to run "with ease" in the hot summer, he added.

"We have special high temperature-proof designs. For example, we have added a special structure beneath the railway equipment compartment to keep warm in the winter. In summer, the grill will be removed so that the cooling capacity of major equipment will be maximized to ensure normal operations in hot weather," he said.

The Harbin-Dalian High-Speed Railway is the first alpine high-speed rail line in the world.

 

Comments (0)

哈大高铁提速在即 制造商详解安全密码

中国北车集团长客股份公司CRH380B型高寒动车组项目负责人朱彦2日接受中新社记者采访时称,哈大高铁提速在即,作为设备制造商,长客正配合铁路部门对列车进行全面检测,以保障300公里时速的运行安全。

>>详细

Copyright ©1999-2011 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.